<span id="zdv7p"></span>

<i id="zdv7p"><b id="zdv7p"><progress id="zdv7p"></progress></b></i>

    <form id="zdv7p"></form><span id="zdv7p"></span>

      <i id="zdv7p"><ins id="zdv7p"><meter id="zdv7p"></meter></ins></i>
      <i id="zdv7p"><ruby id="zdv7p"></ruby></i>

      <output id="zdv7p"><output id="zdv7p"></output></output>

      <ruby id="zdv7p"><b id="zdv7p"><var id="zdv7p"></var></b></ruby>
      精品人妻少妇一区二区城中村|亚洲国产精品尤物yw在线|天天摸天天碰天天添中文|国产精品va在线观看不
      NEWS
      What is the process flow for aluminum alloy processing?

      1、 Broken material

      It is the first process of aluminum alloy technology. Mainly using cutting equipment to accurately cut the length of materials according to design requirements and referring to the detailed construction drawings of doors and windows. The error value of the cutting size should be controlled within the range of 2mm, otherwise the sealing quality of doors and windows is difficult to guarantee.

      2、 Drilling

      The assembly of aluminum alloy frame fans generally uses screw connections, so whether it is the assembly of horizontal and vertical members or the fixation of accessories, drilling holes in corresponding positions is required. Small table drills can be used for drilling profiles, which can effectively ensure the accuracy of drilling positions due to the presence of a workbench; The use of a pistol type electric drill is advantageous for easy operation. Before drilling, lines should be marked and positioned on the profile according to assembly requirements. The drilling position should be accurate and the aperture should be appropriate.

      3、 Assembly

      Assemble the profiles with screws according to the requirements of the construction drawings. There are three assembly methods for aluminum alloy doors and windows: 45 degree angle docking, right angle docking, and vertical docking. The connection of horizontal and vertical bars generally uses specialized connectors or aluminum angles, and is fixed with screws, bolts, or aluminum rivets.

      4、 Protection or packaging

      After assembling the semi-finished products and passing the inspection, clean them thoroughly and cover them with the product qualification certificate.

      NEWS CENTER+
      CONTACT US
      Taizhou JiaDe Forging CO.,LTD.(Aluminum Forging)
      ADD:Auto&Motor Parts Industrial Zone, Yuhuan, Zhejiang, China
      TEL:0086-576-87578555 87350311
      FAX:0086-576-87520426
      Mob:13706556533
      ZIP:317600
      E-mail:info@jiadeforging.com
          sales@jiadeforging.com
      http://www.superluminaltech.com